-
2017
-
Concrete pontoons
Bluewaters Ferry is a luxury island development located just off the Jumeirah Beach Residences (JBR) coastline. The construction of the Bluewaters Ferry Terminal expands the route and reach of the Dubai ferry network, representing a significant milestone in the development of marine transportation infrastructure and connectivity in the emirate.
For this project, Sigma PM Consultancy partnered with COWI and Marinas Performance to deliver the ferry terminal. We engineered it to meet the operational needs of the Road and Transport Authority (RTA) and the Dubai Police. Our design incorporates two restrained-in-place, heavy-duty floating concrete pontoons connected to the promenade with three gangways via a piled fixed platform. The longer pontoon measures 67 meters in length and is capable of mooring two ferries and one abra. The shorter pontoon measures 15 meters in length and can berth two Dubai Police vessels. We have custom-designed robust tubular steel piles to restrain the pontoons while minimising their wear and tear. They are engineered from galvanised steel with high yield strength. Finally, we installed bespoke, high-performance connection boxes that are environmentally rated for safe and efficient power distribution.
The ferry terminal is located next to the Bluewaters pedestrian bridge, which connects the island’s promenade to The Walk at JBR. Moreover, the terminal’s position at the opening of the canal to Dubai Marina conveniently moves passengers between popular destinations and touristic attractions nearby. On Bluewaters Island, guests can experience waterfront retail shopping, indulge in international fine dining at The Wharf, and unwind at luxury beachfront hotels like Caesar’s Palace and Banyan Tree.